單項(xiàng)選擇題Many of the activities performed during the preliminary investigation are still being conducted in(1),but in much greater depth than before. During this phase, the analyst must become fully aware of the(2)and must develop enough knowledge about the(3)and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4)for process and data of current system, the deliverable from this phase also includes the(5)for the proposed system.

A. hardware and software specification
B. system performance specification
C. formal requirements definition
D. general problem statement


你可能感興趣的試題

2.單項(xiàng)選擇題超出項(xiàng)目經(jīng)理控制的成本增加因素,除了存款利率、貸款利息和稅率外,還包括()。

A.項(xiàng)目日常開支的速度和生產(chǎn)率 
B.項(xiàng)目日常開支的速度和工期拖延 
C.項(xiàng)目補(bǔ)貼和加班 
D.原材料成本和運(yùn)輸成本 

3.單項(xiàng)選擇題經(jīng)濟(jì)計(jì)量分析的工作程序依次是()。

A.設(shè)定模型、檢驗(yàn)?zāi)P?、估?jì)模型、改進(jìn)模型 
B.設(shè)定模型、估計(jì)參數(shù)、檢驗(yàn)?zāi)P?、?yīng)用模型 
C.估計(jì)模型、應(yīng)用模型、檢驗(yàn)?zāi)P?、改進(jìn)模型 
D.搜集資料、設(shè)定模型、估計(jì)參數(shù)、應(yīng)用模型 

最新試題

PRINGE2(受控環(huán)境下的項(xiàng)目管理)階段邊界管控流程的目的不包括()

題型:單項(xiàng)選擇題

項(xiàng)目集實(shí)施的3個階段中,為產(chǎn)生項(xiàng)目集管理計(jì)劃個組件的預(yù)期成果而進(jìn)行的項(xiàng)目集活動屬于()

題型:單項(xiàng)選擇題

CMMI即能力成熟度模型集成,共分為5個等級,當(dāng)達(dá)到()開始,要求組織針對過程的管理能夠量化分析和量化預(yù)測。

題型:單項(xiàng)選擇題

組織基于CMMI的過程改進(jìn)不包括()

題型:單項(xiàng)選擇題

CMMI開發(fā)模型中,決策分析與解決實(shí)踐域?qū)?yīng)的能力域類別是()

題型:單項(xiàng)選擇題

建立過程性能基線的目的不包括()

題型:單項(xiàng)選擇題

哈特創(chuàng)立了以控制圖為核心的統(tǒng)計(jì)控制理論(SPC),該控制圖基于正態(tài)分布的原理,如果標(biāo)準(zhǔn)差為±3σ,則數(shù)據(jù)點(diǎn)落在±3σ之外的概率為()

題型:單項(xiàng)選擇題

項(xiàng)目組合經(jīng)理需要具備的專業(yè)知識不包括()

題型:單項(xiàng)選擇題

OPM成熟度等級中,組織中的項(xiàng)目管理決策和流程管理是由數(shù)據(jù)驅(qū)動的屬于()

題型:單項(xiàng)選擇題

產(chǎn)能管理主要涉及的內(nèi)容不包括()

題型:單項(xiàng)選擇題