單項選擇題

You have just created a new VLAN on your network for inter-VLAN routing.  
What is one step that you should include in your VLAN-based implementation and verification plan?()

A.Verify that different native VLANs exist between two switches for security purposes.
B.Verify that the switch is configured to allow for trunking on the switch ports.
C.Verify that each switch port has the proper IP address space assigned to it for the new VLAN. 
D.Verify that the VLAN virtual interface has been correctly created and enabled.


您可能感興趣的試卷

你可能感興趣的試題

1.單項選擇題

You have just created a new VLAN on your network for inter-VLAN routing. 
What is one step that you should include in your VLAN-based implementation and verification plan?()

A.Verify that different native VLANs exist between two switches for security purposes.
B.Verify that the switch is configured to allow for trunking on the switch ports.
C.Verify that each switch port has the proper IP address space assigned to it for the new VLAN. 
D.Verify that the VLAN virtual interface has been correctly created and enabled.

2.單項選擇題

You have just created a new VLAN on your network.
 What is one step that you should include in your VLAN-based implementation and verification plan? ()

A.Verify that trunked links are configured to allow the VLAN traffic.
B.Verify that the switch is configured to allow for trunking on the switch ports.
C.Verify that each switch port has the correct IP address space assigned to it for the new VLAN.
D.Verify that different native VLANs exist between two switches for security purposes.

3.單項選擇題

You have just created a new VLAN on your network.
 What is one step that  you should include in your VLAN based implementation and verification plan? ()

A.Verify that different native VLANs exist between two switches for security purposes.
B.Verify that the VLAN was added on all switches with the use of the show vlan command. 
C.Verify that the switch is configured to allow for trunking on the switch ports.
D.Verify that each switch port has the correct IP address space assigned to it for the new VLAN.

4.單項選擇題What is a critical piece of information that you should have when creating a VLAN-based implementation plan?()

A.approval from senior management
B.end-user requirements
C.IEEE 802.1X authentication parameters
D.a summary implementation plan

5.單項選擇題When you create a network implementation VLAN solution, what is one procedure that you should include in your plan?()

A.Perform an incremental implementation of components.
B.Following the PPDIOO model, implement the entire solution and then test end-to-end to make sure that it is performing as designed.
C.Implement trunking of all VLANs to ensure that traffic is crossing the network as needed before performing any pruning of VLANs.
D.Test the solution on a segmented portion of a lab network prior to rolling out across the entire network.

最新試題

Refer to the exhibit. All network links are FastEthernet. Although there is complete connectivity throughout the network, Front Line users have been complaining that they experience slower network performance when accessing the server farm than the Reception office experiences. Based on the exhibit, which two statements are true?()

題型:多項選擇題

Refer to the exhibit. The command switchport mode access is issued on interface FastEthernet0/13 on switch CAT1. What will be the result?()

題型:單項選擇題

Refer to the exhibit. Which statement is true about the output?()

題型:單項選擇題

Based on the show spanning-tree vlan 200 output shown in the exhibit, which two statements about the STP process for VLAN 200 are true? ()

題型:多項選擇題

How are STP timers and state transitions affected when a topology change occurs in an STP environment?()

題型:單項選擇題

Which two statements are true about BPDU port-guard and BPDU filtering?()

題型:多項選擇題

Refer to the exhibit. What does the command channel-group 1 mode desirable do? () 

題型:單項選擇題

Refer to the exhibit. Initially, LinkA is connected and forwarding traffic. A new LinkB is then attached between SwitchA and HubA. Which two statements are true about the possible result of attaching the second link?()

題型:多項選擇題

What is the configured priority value of the Vlan105’s group on DS2 ?()

題型:單項選擇題

Refer to the exhibit. LACP has been configured on Switch1 as shown. Which is the correct command set to configure LACP on Switch2?()

題型:單項選擇題