You have just created a new VLAN on your network.
What is one step that you should include in your VLAN-based implementation and verification plan? ()
A.Verify that trunked links are configured to allow the VLAN traffic.
B.Verify that the switch is configured to allow for trunking on the switch ports.
C.Verify that each switch port has the correct IP address space assigned to it for the new VLAN.
D.Verify that different native VLANs exist between two switches for security purposes.
您可能感興趣的試卷
你可能感興趣的試題
You have just created a new VLAN on your network.
What is one step that you should include in your VLAN based implementation and verification plan? ()
A.Verify that different native VLANs exist between two switches for security purposes.
B.Verify that the VLAN was added on all switches with the use of the show vlan command.
C.Verify that the switch is configured to allow for trunking on the switch ports.
D.Verify that each switch port has the correct IP address space assigned to it for the new VLAN.
A.approval from senior management
B.end-user requirements
C.IEEE 802.1X authentication parameters
D.a summary implementation plan
A.Perform an incremental implementation of components.
B.Following the PPDIOO model, implement the entire solution and then test end-to-end to make sure that it is performing as designed.
C.Implement trunking of all VLANs to ensure that traffic is crossing the network as needed before performing any pruning of VLANs.
D.Test the solution on a segmented portion of a lab network prior to rolling out across the entire network.
You are planning a new VLAN-based network solution.
What is one item you should consider when creating your implementation plan as it concerns VLANs?()
A.generic router and switch configuration parameters
B.end-to-end test plan after all components have been installed and configured
C.administrator assignments
D.rollback plan
A.default VLAN information for all unused switch ports
B.802.1x configuration parameters
C.number of IP subnets needed
D.IP routing protocol information
最新試題
During routine maintenance, it became necessary to shutdown G1/0/1 on DS1 and DS2. All other interface were up. During this time, DS1 became the active device for Vlan104’s HSRP group. As related to Vlan104’s HSRP group. What can be done to make the group function properly ? ()
Refer to the exhibit. Switch 15 is configured as the root switch for VLAN 10 but not for VLAN 20. If the STP configuration is correct, what will be true about Switch 15?()
DS2 has not become the active device for Vlan103’s HSRP group even though all interfaces are active. As related to Vlan103’s HSRP group. What can be done to make the group function properly ? ()
What is the configured priority value of the Vlan105’s group on DS2 ?()
Which statement is correct about RSTP port roles?()
Refer to the exhibit. Initially, LinkA is connected and forwarding traffic. A new LinkB is then attached between SwitchA and HubA. Which two statements are true about the possible result of attaching the second link?()
Refer to the exhibit. On the basis of the output of the show spanning-tree inconsistentports command, which statement about interfaces FastEthernet 0/1 and FastEthernet 0/2 is true?()
How are STP timers and state transitions affected when a topology change occurs in an STP environment?()
What must be the same to make multiple switches part of the same Multiple Spanning Tree (MST)?()
Which three statements are true of the Link Aggregation Control Protocol (LACP)?()