You are planning a new VLAN-based network solution.
What is one item you should consider when creating your implementation plan as it concerns VLANs?()
A.generic router and switch configuration parameters
B.end-to-end test plan after all components have been installed and configured
C.administrator assignments
D.rollback plan
您可能感興趣的試卷
你可能感興趣的試題
A.default VLAN information for all unused switch ports
B.802.1x configuration parameters
C.number of IP subnets needed
D.IP routing protocol information
During testing of network redundancy in a fully meshed enterprise campus, a problem has been reported. Both distribution multilayer switches are fully configured for redundancy; clients operate normally when the primary multilayer distribution switch is operating. All clients drop connections outside of their respective access layer group when the primary distribution switch is shut down and the secondary distribution switch is still operational. Additional information indicates that the secondary distribution switch is able to ping major corporate and Internet locations.
Which item would be the best point of troubleshooting for this connectivity issue? ()
A.client network configuration
B.VLAN mapping
C.inter-switch trunk configuration
D.UDLD configuration
E.first-hop redundancy protocol
A.aaa port-auth enable
B.radius port-control enable
C.dot1x system-auth-control
D.switchport aaa-control enable
A.The port is configured for both data and voice traffic.
B.The port is fully dedicated to forwarding voice traffic.
C.The port will operate as an FXS telephony port.
D.Voice traffic will be redirected to VLAN 222.
A remote host can be pinged from all switches except one.
Which of the following is the most likely reason for this failure?()
A.VTP pruning has isolated the switch.
B.IP routing is disabled on the switch.
C.PoE is failing on the remote port.
D.There is a loop in the topology.
最新試題
What is the configured priority value of the Vlan105’s group on DS2 ?()
Refer to the exhibit. All network links are FastEthernet. Although there is complete connectivity throughout the network, Front Line users have been complaining that they experience slower network performance when accessing the server farm than the Reception office experiences. Based on the exhibit, which two statements are true?()
DS2 has not become the active device for Vlan103’s HSRP group even though all interfaces are active. As related to Vlan103’s HSRP group. What can be done to make the group function properly ? ()
Based on the show spanning-tree vlan 200 output shown in the exhibit, which two statements about the STP process for VLAN 200 are true? ()
What must be the same to make multiple switches part of the same Multiple Spanning Tree (MST)?()
If G1/0/1 on DS1 is shutdown, what will be the current priority value of the Vlan105’s group on DS1 ?()
Examine the diagram. A network administrator has recently installed the above switched network using 3550s and would like to control the selection of the root bridge.Which switch should theadministrator configure as the root bridge and which configuration command must theadministrator enter to accomplish this?()
Which two statements are true about BPDU port-guard and BPDU filtering?()
During routine maintenance, G1/0/1 on DS1 was shutdown. All other interface were up. DS2 became the active HSRP device for Vlan101 as desired. However, after G1/0/1 on DS1 was reactivated. DS1 did not become the active HSRP device as desired. What need to be done to make the group for Vlan101 function properly ? ()
Refer to the exhibit. Switch S2 contains the default configuration. Switches S1 and S3 both have had the command spanning-tree mode rapid-pvst issued on them. What will be the result?()