In project management, a ( )is a list of a project’s milestones, activities, and deliverables, usually with intended start and finish date. Those items are often estimated in terms of resource allocation, budget and duration, linked by dependencies and scheduled events.
A. schedule
B. WBS
C. SOW
D. charter
( )can be considered as part of risk mitigation.
A. Risk identification
B. Purchasing insurance
C. Assessment of outcomes
D. Assessment of probabilities
( )is not the advantage of GERT (Graphical evaluation and review techniques)as compared with PERT (project evaluation and review techniques).
A. Allowing looping
B. Allowing for dummy tasks
C. Allowing branching
D. Allowing multiple project end results
The length of the IPv6 address is ( ).
A. 64 bytes
B. 128 bytes
C. 64 bits
D. 128 bits
最新試題
范圍核實(shí)將:()
項(xiàng)目管理的過程管理和功能管理(知識領(lǐng)域)的關(guān)系是:()
進(jìn)度計(jì)劃控制一項(xiàng)重要的目的是()
你知道變更控制系統(tǒng)很重要,因?yàn)樗鼈兠枋隽巳绾翁峤蛔兏埱蟛⑶矣涗浟巳绾喂芾碜兏?、跟蹤變更的狀態(tài)和確定變更的管理影響。在控制過程組中下列哪個(gè)過程沒有運(yùn)用變更控制系統(tǒng)作為工具和技術(shù):()
WBS是項(xiàng)目構(gòu)成單元的一個(gè)“產(chǎn)品導(dǎo)向”的構(gòu)架。WBS中的每一項(xiàng)一般都只有一個(gè)確定指標(biāo),這些指標(biāo)是:()
識別和管理項(xiàng)目風(fēng)險(xiǎn)的責(zé)任應(yīng)由誰承擔(dān)?()
產(chǎn)品能否獲得取決于兩個(gè)要素:()
在合同談判中,廠商告訴你在征求建議書最初參與投標(biāo)的設(shè)備已經(jīng)不再生產(chǎn)了。他們說最好的解決方法是購買他們所提供的新設(shè)備,價(jià)錢比原來的要高。你所擔(dān)心的是新設(shè)備可能和現(xiàn)有的設(shè)備不兼容,并嘗試與他們討論該問題。但他們提醒你,這個(gè)決定是上次合同談判會確定的,所以沒有必要繼續(xù)討論該問題。這是以下哪項(xiàng)的例子?()
下圖的項(xiàng)目費(fèi)用控制圖,表示在第5個(gè)月項(xiàng)目處于什么狀態(tài):()
為了評估因趕工對項(xiàng)目可能造成的影響,項(xiàng)目經(jīng)理首先應(yīng)該計(jì)算:()