單項選擇題

In project management, a ( )is a list of a project’s milestones, activities, and deliverables, usually with intended start and finish date. Those items are often estimated in terms of resource allocation, budget and duration, linked by dependencies and scheduled events.
 

A. schedule
B. WBS
C. SOW
D. charter


你可能感興趣的試題

1.單項選擇題

( )can be considered as part of risk mitigation.
 

A. Risk identification
B. Purchasing insurance
C. Assessment of outcomes
D. Assessment of probabilities

2.單項選擇題

( )is not the advantage of GERT (Graphical evaluation and review techniques)as compared with PERT (project evaluation and review techniques).
 

A. Allowing looping
B. Allowing for dummy tasks
C. Allowing branching
D. Allowing multiple project end results

3.單項選擇題

The length of the IPv6 address is ( ).
 

A. 64 bytes
B. 128 bytes
C. 64 bits
D. 128 bits

5.單項選擇題以下關(guān)于變更的流程和規(guī)則的做法中,()是錯誤的

A、以口頭方式提出某項變更,在評估前針對該變更提交了書面報告XXX
B、項目組成員變更以郵件發(fā)出,在評審前填寫了變更申請
C、為了規(guī)范,監(jiān)理不對變更進(jìn)行分級,所有變更流程都不能簡化
D、按照影響范圍、緊急程度吧變更分為3個優(yōu)先級別

最新試題

談判的根本目標(biāo)是()

題型:單項選擇題

你是美國國旗公司的項目經(jīng)理,公司設(shè)計了一條美國特征的國旗生產(chǎn)線。由于一些特殊的情況,該產(chǎn)品的需求很熱,項目贊助商要求你盡快完成項目及交付產(chǎn)品。你決定刪除一些非關(guān)鍵要求,增加項目資源。由于時間是目前的一個關(guān)鍵因素,所以贊助商同意支付額外的費用。你使用了以下哪種技術(shù)?()

題型:單項選擇題

為了評估因趕工對項目可能造成的影響,項目經(jīng)理首先應(yīng)該計算:()

題型:單項選擇題

某項目經(jīng)理剛被聘用,并設(shè)法與他人的合作。在這種狀態(tài)下,他要采用哪種最佳的權(quán)利方式來獲得合作?()

題型:單項選擇題

鏈接管理是()

題型:單項選擇題

識別和管理項目風(fēng)險的責(zé)任應(yīng)由誰承擔(dān)?()

題型:單項選擇題

開發(fā)過程的調(diào)整和優(yōu)化發(fā)生在質(zhì)量管理的哪個階段:()

題型:單項選擇題

下圖的項目費用控制圖,表示在第5個月項目處于什么狀態(tài):()

題型:單項選擇題

你是收款機系統(tǒng)的項目經(jīng)理,你公司為零售業(yè)生產(chǎn)收款和系統(tǒng)軟件。你客戶提出了一個改變收款機系統(tǒng)特征的變更要求。你運用了綜合變更控制過程的哪個工具和技術(shù)來描述了收款機系統(tǒng)的特征?()

題型:單項選擇題

范圍核實將:()

題型:單項選擇題