單項(xiàng)選擇題Which of the following is a compelling reason to deploy IBM Systems Director Active Energy Manager (AEM) in a data center with high energy utilization?()

A.Removes the requirement for Intelligent PDUs
B.Monitor and balance disk speeds according to utilization needs
C.Is a required element forEnergyStar certification of the server/data center
D.Monitor and report power and thermal trending to optimize energy consumption "Pass Any Exam.  AnyTime." - 14 IBM 000-106: Practice Exam


您可能感興趣的試卷

你可能感興趣的試題

2.單項(xiàng)選擇題While using virtualization to share SAN adapters on a server, how does Node Port ID Virtualization (NPIV) differ from Virtual SCSI (vSCSI) related to the use of multipathing software?()

A.NPIV andvSCSI both require multipathing in VIO Server only.
B.NPIV requiresmultipathing software on client LPARs, vSCSI requires multipathing software on VIO Server.
C.NPIV requiresmultipathing software on VIO Server, vSCSI requires multipathing software on client LPARs.
D.NPIV requiresmultipathing and MPIO software on VIO Server LPARs, vSCSI requires multipathing   software on VIO Server and MPIO on client LPARs.

3.單項(xiàng)選擇題

A customer is installing an HMC-managed Power 720 with two partitions, one for Production the other for Testing. They plan to use the Testing partition only occasionally and want to minimize hardware.
Which of the following meets these requirements?()

A.Create a system profile for each partition. Assign all needed resources as 'required'.
B.Define all system resources as 'desired' on the Testing partition. Activate only as needed.
C.Create two shared processor pools. Assign the minimal I/O resources required for each partition to the  shared pools.
D.Create both partitions with minimal 'required' resources, and optional resources as 'desired'.  Activate each partition as necessary.

4.單項(xiàng)選擇題How can resource allocations for an active partition on a Power 750 be changed immediately and permanently?()

A.Use Capacity on Demand to add the resources.
B.Use DLPAR to add the resources and select the 'permanent' option.
C.Use DLPAR to add the resources, and change the partition profile.
D.Use an Operating System command to permanently request the resources.

最新試題

How can resource allocations for an active partition on a Power 750 be changed immediately and permanently?()

題型:?jiǎn)雾?xiàng)選擇題

A customer requires their application to have high availability within a data center, and also the ability to recover at a data center located 600km away in the event of an outage.Which system software solution component supports the customer requirement?()

題型:?jiǎn)雾?xiàng)選擇題

A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3).Which of these statements is true and would minimize the cost?()

題型:?jiǎn)雾?xiàng)選擇題

Which of the following configuration is valid for expansion drawers on a Power 750 with 2 processor board sinstalled?()

題型:?jiǎn)雾?xiàng)選擇題

A customer would like to configure an uncapped LPAR so that it can use 2 to 8 cores depending on the workload characteristics. With SMT4 enabled, what is the least amount of processing resources which can be configured for the LPAR?()

題型:?jiǎn)雾?xiàng)選擇題

A customer has 4 application and 2 database servers that will be installed in partitions on a Power 750. They are concerned that the database software vendor will charge based on every processor core in the server.Which action will reduce the potential vendor software costs?()

題型:?jiǎn)雾?xiàng)選擇題

A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750.Which action allows the most efficient use of existing equipment?()

題型:?jiǎn)雾?xiàng)選擇題

Which operating system can directly host managed storage for IBM i, AIX, Linux, VMware and Windows on a Power Systems server?()

題型:?jiǎn)雾?xiàng)選擇題

A retail customer has an 8-core Power 740 server with 2 partitions. Production has 4 dedicated cores and the test partition has 2 dedicated cores. Both partitions run during the day without problems. At night, batch processing is exceeding the run window.Which solution addresses this problem without requiring additional  hardware?()

題型:?jiǎn)雾?xiàng)選擇題

A POWER7 processor has L1, L2 and L3 caches. Which of the three caches uses embedded DRAM (eDRAM) technology?()

題型:?jiǎn)雾?xiàng)選擇題