單項(xiàng)選擇題Which operating system can directly host managed storage for IBM i, AIX, Linux, VMware and Windows on a Power Systems server?()

A.AIX
B.IBMi
C.Linux
D.VIO Server


您可能感興趣的試卷

你可能感興趣的試題

5.單項(xiàng)選擇題Which system provides the highest performance per core, and the least cost for applications licensed per core?()

A.A Power 795 withMaxCore mode
B.A Power 780 withMaxCore mode
C.A Power 755 withTurboCore mode
D.A Power 780 withTurboCore mode

最新試題

A system is being designed with many LPARs which will be clients of dual VIO Servers. The VIO Servers must be redundant so that, in the event of scheduled maintenance, the clients do not need to be shut down.Which of these strategies could be used to ensure that the client LPARs continue to be able to use the network in the event of a VIO Server being shut down?()

題型:?jiǎn)雾?xiàng)選擇題

Which system provides the highest performance per core, and the least cost for applications licensed per core?()

題型:?jiǎn)雾?xiàng)選擇題

A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3).Which of these statements is true and would minimize the cost?()

題型:?jiǎn)雾?xiàng)選擇題

A customer wants to implement the following Blades in BladeCenter H:Two POWER Blades running IBM i partitions.Two POWER Blades running AIX and LinuxFour x86 Blades running Windows.Which of the following design consideration statements is correct?()

題型:?jiǎn)雾?xiàng)選擇題

A customer requires their application to have high availability within a data center, and also the ability to recover at a data center located 600km away in the event of an outage.Which system software solution component supports the customer requirement?()

題型:?jiǎn)雾?xiàng)選擇題

Using the following information: Performance data from an existing system that a new system will replace; Performance estimates that anticipate future workloads; Micro-partitioning and logical partitioning implementations.Which of the following allows a technical sales representative to create a system design which can be imported into an HMC?()

題型:?jiǎn)雾?xiàng)選擇題

Which of the following has an integrated database?()

題型:?jiǎn)雾?xiàng)選擇題

A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached; One 4-port 1Gbps IVE adapterPowerVM Standard Edition; They need to add a GX++ adapter and cable it to an I/O drawer.Which of the following must also be ordered?()

題型:?jiǎn)雾?xiàng)選擇題

Ancustomer with limited storage management skills needs a disk subsystem with up to 70TB capacity and enterprise class performance. Which disk storage system should be recommended?()

題型:?jiǎn)雾?xiàng)選擇題

A customer is installing an HMC-managed Power 720 with two partitions, one for Production the other for Testing. They plan to use the Testing partition only occasionally and want to minimize hardware.Which of the following meets these requirements?()

題型:?jiǎn)雾?xiàng)選擇題