A customer has 4 application and 2 database servers that will be installed in partitions on a Power 750. They are concerned that the database software vendor will charge based on every processor core in the server.
Which action will reduce the potential vendor software costs?()
A.Create capped partitions for the database servers.
B.Create workload partitions for the database servers.
C.Create a separate shared processor pool for the database servers.
D.Create virtual processors equal to the entitlement for database servers.
您可能感興趣的試卷
你可能感興趣的試題
A customer is upgrading from a 16-core POWER6 570 with two enclosures to a 16-core Power 770 with only one enclosure. There are 22 PCI-X adapters and 19 PCIe adapters spread across the current CECs and I/O drawers.
How many and what kind of drawers are needed to connect these adapters?()
A.2 PCI-X drawers and 2 PCIe drawers
B.3 PCI-X drawers and 4 PCIe drawers
C.4 PCI-X drawers and 3 PCIe drawers
D.4 PCI-X drawers and 2 PCIe drawers
A system administrator has been instructed to attach storage in their client LPARs, in a Power 770, with fibre channel adapters using N_port ID virtualization (NPIV).
Which of the following partitions has the minimum requirements to utilize virtual fibre channel?()
A.LPAR-A with 1Gb FC HBA and SAN connection
B.LPAR-B with 2Gb FC HBA and SAN connection
C.LPAR-C with 4Gb FC HBA and SAN connection
D.LPAR-D with 8Gb FC HBA and SAN connection
A customer has shut down an LPAR after using DLPAR to add or remove processor and memory resources. When the partition is reactivated, the desired changes are missing.
What action, or sequence of actions, will immediately and permanently solve this problem?()
A.Add or remove the resources in the profile, click 'apply', then 'save'.
B.Add or remove the resources using DLPAR and change the partition profile.
C.Add or remove the resources using DLPAR, then shutdown and reactivate the LPAR.
D.Add or remove the resources in the system profile and reboot the managed system.
A customer has a Power 770 running an SAP ERP workload on AIX 7. It has a single partition with 12 cores and 48GB of memory and the CPU is underutilized at 46% with 1000 users. Memory utilization is at 80%. The number of users will increase to 1700, increasing memory utilization by 37%.
Which of the following supports this requirement?()
A.Active Memory Server
B.Active Memory Sharing
C.Active Memory Pooling
D.Active Memory Expansion
A.1
B.2
C.4
D.8
最新試題
How can resource allocations for an active partition on a Power 750 be changed immediately and permanently?()
A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached; One 4-port 1Gbps IVE adapterPowerVM Standard Edition; They need to add a GX++ adapter and cable it to an I/O drawer.Which of the following must also be ordered?()
A customer has an LPAR with 4 dedicated cores on a POWER7 server with SMT4 enabled. How many logical processors are presented to an application running on this LPAR?()
Ancustomer with limited storage management skills needs a disk subsystem with up to 70TB capacity and enterprise class performance. Which disk storage system should be recommended?()
A customer is deploying a new database on a PS701 Blade in a BladeCenter H, and requires redundant network and SAN adapters. Which configuration supports the customer requirement?()
A customer is evaluating PowerVM and VMware to run a data warehouse application. Which feature of PowerVM should be highlighted as a differentiator?()
A Power 720 customer using IVM wants to implement dual VIO servers, but is unable to create the second server. What is the most likely reason for this?()
A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750.Which action allows the most efficient use of existing equipment?()
A POWER7 processor has L1, L2 and L3 caches. Which of the three caches uses embedded DRAM (eDRAM) technology?()
A customer requires their application to have high availability within a data center, and also the ability to recover at a data center located 600km away in the event of an outage.Which system software solution component supports the customer requirement?()