A.Concurrent firmware updates
B.Management of virtual storage
C.Hot add/remove of I/O drawers
D.Management of Capacity on Demand
您可能感興趣的試卷
你可能感興趣的試題
A.An HMC is required for dual VIO servers.
B.Dual VIO servers require a split backplane.
C.A dual VIO enablement code must be entered from the ASMI interface.
D.The second VIO server must be created using the IVM command line interface.
A.Removes the requirement for Intelligent PDUs
B.Monitor and balance disk speeds according to utilization needs
C.Is a required element for EnergyStar certification of the server/data center
D.Monitor and report power and thermal trending to optimize energy consumption
A.Backup data Manage problems Monitor network system
B.Report problems Manage servers and virtual environment Monitor the network
C.Monitor system health and network Install and manage AIX and IBM i Manage energy consumption
D.Monitor system health and network Manage servers and virtual environment Collect performance data
A.PowerVM Standard Edition
B.VMControl Standard Edition
C.Hardware Management Console
D.IBM Systems Director Standard Edition
A.Energy management
B.Virtual image deployment
C.Virtual resource management
D.Networking device management
最新試題
A company plans to deploy a two-enclosure, 23-core Power 780 system with AIX, IBM i and Linux in thefollowing configuration: 3 AIX partitions with dedicated network and disk adapters; 1 native IBM i partition acting as a host1 hosted IBM i partition; 2 hosted Linux partitions.Which configuration will provide boot disk capability to all partitions?()
A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3).Which of these statements is true and would minimize the cost?()
A customer has a 4-core POWER6 570 with 4 partitions and a 2-port 1Gbps Integrated Virtual Ethernet (IVE) Adapter. They are having problems with throughput on the Ethernet adapter and want to improve performance.Which of the following solutions will help the customer with this issue for the least cost and with the least interruption?()
A customer is evaluating PowerVM and VMware to run a data warehouse application. Which feature of PowerVM should be highlighted as a differentiator?()
A system is being designed with many LPARs which will be clients of dual VIO Servers. The VIO Servers must be redundant so that, in the event of scheduled maintenance, the clients do not need to be shut down.Which of these strategies could be used to ensure that the client LPARs continue to be able to use the network in the event of a VIO Server being shut down?()
A customer would like to configure an uncapped LPAR so that it can use 2 to 8 cores depending on the workload characteristics. With SMT4 enabled, what is the least amount of processing resources which can be configured for the LPAR?()
A customer plans to consolidate multiple business unit applications on a single Power Systems server. The maximum number of cores which can be used by each business unit must be limited by creating shared processor pools.What is the minimum PowerVM Edition which provides this feature?()
A customer has 4 application and 2 database servers that will be installed in partitions on a Power 750. They are concerned that the database software vendor will charge based on every processor core in the server.Which action will reduce the potential vendor software costs?()
Which operating system can directly host managed storage for IBM i, AIX, Linux, VMware and Windows on a Power Systems server?()
A customer wants to migrate their existing compute-intensive POWER6 570 to a Power 770. Which of their existing I/O adapters can be migrated to Power 770 enclosures?()