A.Hardware InfoCenter
B.System Planning Tool
C.Offering Information website
D.Technical Delivery and Assessment Guide
您可能感興趣的試卷
你可能感興趣的試題
A customer has a 4-core POWER6 570 with 4 partitions and a 2-port 1Gbps Integrated Virtual Ethernet (IVE) Adapter. They are having problems with throughput on the Ethernet adapter and want to improve performance.
Which of the following solutions will help the customer with this issue for the least cost and with the least interruption?()
A.Order a 2-port 1Gbps Ethernet LAN adapter.
B.Order a 2-port 10Gbps Ethernet LAN adapter.
C.Upgrade the IVE adapter to a 4-port 1Gbps IVE adapter.
D.Upgrade the IVE adapter to a 2-port 10Gbps IVE adapter.
A.8 desired processing units and 8 desired virtual processors
B.2 desired processing units and 8 desired virtual processors
C.8 desired processing units and 32 desired virtual processors
D.2 desired processing units and 32 desired virtual processors
Using the following information: Performance data from an existing system that a new system will replace; Performance estimates that anticipate future workloads; Micro-partitioning and logical partitioning implementations.
Which of the following allows a technical sales representative to create a system design which can be imported into an HMC?()
A.IBMeConfig
B.IBM Performance Monitor
C.IBM Workload Estimator (WLE)
D.IBM System Planning Tool (SPT)
A.NPIV andvSCSI both require multipathing in VIO Server only.
B.NPIV requiresmultipathing software on client LPARs, vSCSI requires multipathing software on VIO Server.
C.NPIV requiresmultipathing software on VIO Server, vSCSI requires multipathing software on client LPARs.
D.NPIV requiresmultipathing and MPIO software on VIO Server LPARs, vSCSI requires multipathing software on VIO Server and MPIO on client LPARs.
A.L3 only
B.L1 and L2
C.L2 and L3
D.L1, L2 and L3
A retail customer has an 8-core Power 740 server with 2 partitions. Production has 4 dedicated cores and the test partition has 2 dedicated cores. Both partitions run during the day without problems. At night, batch processing is exceeding the run window.
Which solution addresses this problem without requiring additional hardware?()
A.AddingVMControl will automate processor resource allocation during peak workloads.
B.Enable Dynamic Symmetric Multithreading in the HMC to balance workloads across processors.
C.Add processing resources during the times they are required using Utility Capacity on Demand.
D.Changing the partitions to Uncapped can make use of additional processor cycles during peak workloads.
A.Power 710
B.Power 720
C.Power 730
D.Power 740
A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3).
Which of these statements is true and would minimize the cost?()
A.All the machines can be connected to the existing HMC, as long as it is updated to code level 7.7.1 or later
B.The Power 770 requires an HMC (7042-CR5 or later), so they must buy one. All of the systems can be managed by this new HMC
C.They should buy a new HMC for the Power 770 system, and leave the POWER5 and POWER6 based systems connected to the existing one
D.The Power 770 requires an HMC, so they should connect the Power 770 to the HMC and convert the POWER5 and POWER6 based servers to IVM
A system is being designed with many LPARs which will be clients of dual VIO Servers. The VIO Servers must be redundant so that, in the event of scheduled maintenance, the clients do not need to be shut down.
Which of these strategies could be used to ensure that the client LPARs continue to be able to use the network in the event of a VIO Server being shut down?()
A.ImplementPowerHA SystemMirror on both VIO servers.
B.ConfigureEtherchannel between the client LPARs and the two VIO servers
C.Configure Network Interface Backup between the two VIO servers and use each VIO server to access the network.
D.Implement Shared Ethernet Adapter failover and have all client partitions access the network through the shared adapters.
A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750.
Which action allows the most efficient use of existing equipment?()
A.Populate the Power 750 first then add a GX+ adapter to support PCI-X andPCIe I/O drawer loops.
B.Populate the Power 750 first then add 2 GX+ adapters to support PCI-X andPCIe I/O drawer loops.
C.Populate the Power 750 first then add a GX++ adapter to support PCI-X andPCIe I/O drawer loops.
D.Populate the Power 750 first then add GX+ and GX++ adapters to support PCI-X andPCIe I/O drawer loops.
最新試題
A customer has an HMC-managed Power Systems server with 6 partitions. Four production partitions are subject to varying workloads throughout the day, and two are used for development and testing. The production applications have different licensing limitations on the number of physical cores that may be used. The development partitions can use no more than 1 core. The customer would like to dynamically optimize processor utilization within the licensing limits, with minimal operator intervention.Which of the following meets the customer requirement?()
A customer is deploying a new database on a PS701 Blade in a BladeCenter H, and requires redundant network and SAN adapters. Which configuration supports the customer requirement?()
A Power 720 customer using IVM wants to implement dual VIO servers, but is unable to create the second server. What is the most likely reason for this?()
Which of the following is a compelling reason to deploy IBM Systems Director Active Energy Manager (AEM) in a data center with high energy utilization?()
Ancustomer with limited storage management skills needs a disk subsystem with up to 70TB capacity and enterprise class performance. Which disk storage system should be recommended?()
A customer is evaluating PowerVM and VMware to run a data warehouse application. Which feature of PowerVM should be highlighted as a differentiator?()
A customer is implementing a POWER Blade solution which requires the VIO Server to be mirrored on internal disk drives. Which Blade supports the requirement?()
Which operating system can directly host managed storage for IBM i, AIX, Linux, VMware and Windows on a Power Systems server?()
An end user is deploying Blade servers to replace obsolete rack mounted servers. In addition to AIX Web server and database workloads, they also have Windows workloads.Which Blade is designed for Windows workloads?()
A company plans to deploy a two-enclosure, 23-core Power 780 system with AIX, IBM i and Linux in thefollowing configuration: 3 AIX partitions with dedicated network and disk adapters; 1 native IBM i partition acting as a host1 hosted IBM i partition; 2 hosted Linux partitions.Which configuration will provide boot disk capability to all partitions?()