A customer has a 32-core Power 770 with 4 AIX partitions and 2 IBM i partitions. They want to improve network availability and allow for concurrent maintenance.
What will support the customer requirement at  least cost?()

A.Build the logical partition infrastructure based on 6 or more VLANs.
B.Build the logical partition infrastructure based on two or more IVEs.
C.Build the logical partition infrastructure based on Partition Mobility.
D.Build the logical partition infrastructure based on redundant VIO Servers.


您可能感興趣的試卷

你可能感興趣的試題

1.單項選擇題A Technical and Delivery Assessment (TDA) is a structured technical inspection of a completed solution design. After the inspection is complete, what deliverable can the customer expect?()

A.Verification of the expected performance of the new solution.
B.A document used by IBM manufacturing to build and ship the system solution.
C.An IBM Quality Assurance Certificate which is supplied to the customer with the system.
D.A list of actions that are recommended to reduce risk and create a successful implementation.

2.單項選擇題

A system is being designed with many LPARs which will be clients of dual VIO Servers. The VIO Servers  must be redundant so that, in the event of scheduled maintenance, the clients do not need to be shut down.
Which of these strategies could be used to ensure that the client LPARs continue to be able to use the network in the event of a VIO Server being shut down?()

A.Implement PowerHA SystemMirror on both VIO servers.
B.Configure Etherchannel between the client LPARs and the two VIO servers.
C.Configure Network Interface Backup between the two VIO servers and use each VIO server to access the  network.
D.Implement Shared Ethernet Adapter failover and have all client partitions access the network through the shared adapters.

3.單項選擇題

A customer is unsure how POWER7 processors can outperform POWER6 processors when the clock speeds are slower.
What contributes to the improved performance?()

A.Added Turbo memory switching
B.Removed internal OLTP limits
C.Moved L3 cache onto the chip
D.Increased DDR2 memory speeds

最新試題

A customer has an HMC-managed Power Systems server with 6 partitions. Four production partitions are subject to varying workloads throughout the day, and two are used for development and testing. The production applications have different licensing limitations on the number of physical cores that may be used. The development partitions can use no more than 1 core. The customer would like to dynamically optimize processor utilization within the licensing limits, with minimal operator intervention.Which of the following meets the customer requirement?()

題型:單項選擇題

A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached; One 4-port 1Gbps IVE adapterPowerVM Standard Edition; They need to add a GX++ adapter and cable it to an I/O drawer.Which of the following must also be ordered?()

題型:單項選擇題

An end user is deploying Blade servers to replace obsolete rack mounted servers. In addition to AIX Web server and database workloads, they also have Windows workloads.Which Blade is designed for Windows workloads?()

題型:單項選擇題

Which system provides the highest performance per core, and the least cost for applications licensed per core?()

題型:單項選擇題

A retail customer has an 8-core Power 740 server with 2 partitions. Production has 4 dedicated cores and the test partition has 2 dedicated cores. Both partitions run during the day without problems. At night, batch processing is exceeding the run window.Which solution addresses this problem without requiring additional  hardware?()

題型:單項選擇題

A customer has an LPAR with 4 dedicated cores on a POWER7 server with SMT4 enabled. How many logical processors are presented to an application running on this LPAR?()

題型:單項選擇題

A system is being designed with many LPARs which will be clients of dual VIO Servers. The VIO Servers must be redundant so that, in the event of scheduled maintenance, the clients do not need to be shut down.Which of these strategies could be used to ensure that the client LPARs continue to be able to use the network in the event of a VIO Server being shut down?()

題型:單項選擇題

A customer requires two 12X loops on their new POWER7 system. What is the smallest system that will support two loops?()

題型:單項選擇題

Which of the following configuration is valid for expansion drawers on a Power 750 with 2 processor board sinstalled?()

題型:單項選擇題

A customer wants to migrate their existing compute-intensive POWER6 570 to a Power 770. Which of their existing I/O adapters can be migrated to Power 770 enclosures?()

題型:單項選擇題