A.Verification of the expected performance of the new solution.
B.A document used by IBM manufacturing to build and ship the system solution.
C.An IBM Quality Assurance Certificate which is supplied to the customer with the system.
D.A list of actions that are recommended to reduce risk and create a successful implementation.
您可能感興趣的試卷
你可能感興趣的試題
A system is being designed with many LPARs which will be clients of dual VIO Servers. The VIO Servers must be redundant so that, in the event of scheduled maintenance, the clients do not need to be shut down.
Which of these strategies could be used to ensure that the client LPARs continue to be able to use the network in the event of a VIO Server being shut down?()
A.Implement PowerHA SystemMirror on both VIO servers.
B.Configure Etherchannel between the client LPARs and the two VIO servers.
C.Configure Network Interface Backup between the two VIO servers and use each VIO server to access the network.
D.Implement Shared Ethernet Adapter failover and have all client partitions access the network through the shared adapters.
A customer is unsure how POWER7 processors can outperform POWER6 processors when the clock speeds are slower.
What contributes to the improved performance?()
A.Added Turbo memory switching
B.Removed internal OLTP limits
C.Moved L3 cache onto the chip
D.Increased DDR2 memory speeds
A.1
B.2
C.4
D.6
A.SSD
B.SSA
C.SAS
D.SAN
A.NPIV presents Virtual HBA addresses and vendor specific information for disk and tape devices.vSCSI presents generic disk and tape device interfaces.
B.NPIV presents generic disk and tape device interfaces on virtual HBA addresses.vSCSI presents HBA addresses as SCSI with vendor specific information for disk and tape devices.
C.NPIV presents HBA addresses and vendor specific device information directly to the client partition.vSCSI presents vendor specific disk information and generic tape device interfaces through VIO server.
D.NPIV presents virtual HBA addresses with generic device information for SCSI based disk and tape devices.vSCSI presents vendor specific information for disk and tape device devices attached via SCSI hardware interfaces.
最新試題
A customer requires their application to have high availability within a data center, and also the ability to recover at a data center located 600km away in the event of an outage.Which system software solution component supports the customer requirement?()
A customer would like to configure an uncapped LPAR so that it can use 2 to 8 cores depending on the workload characteristics. With SMT4 enabled, what is the least amount of processing resources which can be configured for the LPAR?()
Which of the following items in a single enclosure Power 770 improves Reliability, Availability, and Serviceability?()
While using virtualization to share SAN adapters on a server, how does Node Port ID Virtualization (NPIV) differ from Virtual SCSI (vSCSI) related to the use of multipathing software?()
A customer is installing an HMC-managed Power 720 with two partitions, one for Production the other for Testing. They plan to use the Testing partition only occasionally and want to minimize hardware.Which of the following meets these requirements?()
A customer is implementing a POWER Blade solution which requires the VIO Server to be mirrored on internal disk drives. Which Blade supports the requirement?()
A company plans to deploy a two-enclosure, 23-core Power 780 system with AIX, IBM i and Linux in thefollowing configuration: 3 AIX partitions with dedicated network and disk adapters; 1 native IBM i partition acting as a host1 hosted IBM i partition; 2 hosted Linux partitions.Which configuration will provide boot disk capability to all partitions?()
An end user is deploying Blade servers to replace obsolete rack mounted servers. In addition to AIX Web server and database workloads, they also have Windows workloads.Which Blade is designed for Windows workloads?()
Which system provides the highest performance per core, and the least cost for applications licensed per core?()
A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750.Which action allows the most efficient use of existing equipment?()