A.Before the first solution design meeting with the customer
B.After the solution design proposal is submitted to manufacturing for review
C.Once the customer has supplied the solution design specifications to the sales team
D.After the solution design is completed and before the proposal is submitted to the customer
您可能感興趣的試卷
你可能感興趣的試題
A.Identify, assess, and mitigate technical risks.
B.Verify pricing and gather components for special bid submission.
C.Verify the proposed solution will fit within the customer's budget.
D.Review competitive offerings, system performance and delivery schedules.
Using the following information: Performance data from an existing system that a new system will replace; Performance estimates that anticipate future workloads; Micro-partitioning and logical partitioning implementations.
Which of the following allows a technical sales representative to create a system design which can be imported into an HMC?()
A.IBM eConfig
B.IBM Performance Monitor
C.IBM Workload Estimator (WLE)
D.IBM System Planning Tool (SPT)
A customer requires their application to have high availability within a data center, and also the ability to recover at a data center located 600km away in the event of an outage.
Which system software solution component supports the customer requirement?()
A.PowerHA SystemMirror Basic Edition
B.PowerHA SystemMirror Express Edition
C.PowerHA SystemMirror Standard Edition
D.PowerHA SystemMirror Enterprise Edition
A.DS6800
B.DS8100
C.DS8300
D.XIV Storage System
A.JS21
B.JS23
C.PS700
D.PS701
最新試題
Which of the following is a compelling reason to deploy IBM Systems Director Active Energy Manager (AEM) in a data center with high energy utilization?()
A system is being designed with many LPARs which will be clients of dual VIO Servers. The VIO Servers must be redundant so that, in the event of scheduled maintenance, the clients do not need to be shut down.Which of these strategies could be used to ensure that the client LPARs continue to be able to use the network in the event of a VIO Server being shut down?()
Ancustomer with limited storage management skills needs a disk subsystem with up to 70TB capacity and enterprise class performance. Which disk storage system should be recommended?()
A customer wants to migrate their existing compute-intensive POWER6 570 to a Power 770. Which of their existing I/O adapters can be migrated to Power 770 enclosures?()
A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached; One 4-port 1Gbps IVE adapterPowerVM Standard Edition; They need to add a GX++ adapter and cable it to an I/O drawer.Which of the following must also be ordered?()
A customer has an HMC-managed Power Systems server with 6 partitions. Four production partitions are subject to varying workloads throughout the day, and two are used for development and testing. The production applications have different licensing limitations on the number of physical cores that may be used. The development partitions can use no more than 1 core. The customer would like to dynamically optimize processor utilization within the licensing limits, with minimal operator intervention.Which of the following meets the customer requirement?()
A customer is implementing a POWER Blade solution which requires the VIO Server to be mirrored on internal disk drives. Which Blade supports the requirement?()
A company plans to deploy a two-enclosure, 23-core Power 780 system with AIX, IBM i and Linux in thefollowing configuration: 3 AIX partitions with dedicated network and disk adapters; 1 native IBM i partition acting as a host1 hosted IBM i partition; 2 hosted Linux partitions.Which configuration will provide boot disk capability to all partitions?()
Using the following information: Performance data from an existing system that a new system will replace; Performance estimates that anticipate future workloads; Micro-partitioning and logical partitioning implementations.Which of the following allows a technical sales representative to create a system design which can be imported into an HMC?()
Which of the following items in a single enclosure Power 770 improves Reliability, Availability, and Serviceability?()