多項選擇題A new VLAN needs to be created for an existing network. Which of the following are the minimum tasks that must be accomplished in order to create the new VLAN?()

A. The VLAN must be created
B. The VLAN must be named
C. An IP address and subnet mask must be configured for the new VLAN
D. The desired ports must be added to the new VLAN
E. The VLAN must be added to the existing VTP Domain


您可能感興趣的試卷

你可能感興趣的試題

1.單項選擇題What is a characteristic of ISL and 802.1q frame tagging in a switched LAN environment?()

A. They are used to find the best path through a network.
B. They allow the exchange of filtering tables.
C. They specify different implementations of the Spanning-Tree Protocol.
D. They allow the exchange of routing tables
E. They provide inter-switch VLAN communication.

2.多項選擇題Which of the following a true statements regarding the use of VLANs to segment anetwork? ()

A. They increase the size of collision domains
B. They allow logical grouping of users by function.
C. They can enhance network security.
D. They increase the size of the broadcast domain while decreasing the number of collision domains.
E. They increase the number of broadcast domains while decreasing the size of the broadcast domains.
F. They simplify switch administration.

3.單項選擇題A new switch is installed into an existing LAN and a new VTP trunk is set up with an existing switch. Which VLANs will be allowed on this new trunk?()

A. All defined VLANs are allowed on the trunk by default.
B. Each VLAN, or VLAN range, that is specified with the switchport mode command.
C. Each VLAN, or VLAN range, that is specified with the vtp domain command.
D. Each VLAN, or VLAN range, that is specified with the vlan database command.

4.多項選擇題

A new switch is being installed and you have been assigned the task of connecting it to an existing switch. In doing this, you want to set up the VLAN Trunking Protocol so that VLAN information can be passed between the switches.
Which of the following must you do to accomplish this?()

A. You must set each end of the trunk line to IEEE 802.1e encapsulation.
B. You must set the same VTP management domain name on both switches.
C. You must set all ports on the two switches as access ports.
D. You must configure one of the switches as a VTP server.
E. You must use a rollover cable to connect the two switches.

5.單項選擇題

You are bringing up a new Cisco Catalyst switch, and wish to connect it via a trunk to another switch from a different vendor, which uses the IEEE standard for the trunking method.
When setting the encapsulation type on the trunk, what should you configure on the Cisco switch?()

A. Switch(config)# switchport trunk encapsulation isl
B. Switch(config)# switchport trunk encapsulation ietf
C. Switch(config-if)# switchport trunk encapsulation isl
D. Switch(config-if)# switchport trunk encapsulation ietf
E. Switch(config-if)# switchport trunk encapsulation dot1q