Microsoft's COM is a software(1)that allows applications to be built from binary software components. COM is the underlying architecture that forms the foundation for higher-level software services, like those provided by OLE. COM defines a binary standard for function calling between components,a way for components to dynarmically discover the interfaces implemented by other components, and amechanism to identify components and their interfaces uniquely. OLE is a compound(2)standard developed by Microsoft. OLE makes it possible to create(3)with one application and link or embed them in a second application.Embedded objects retain their original format and(4)to the application that created them. Support for OLE is builtinto the Windows and MacOS Operating Systems.A(5)compound document standard developed mainly by Apple and IBM is called OpenDoc.
空白(5)處應(yīng)選擇()
A.completing
B.competing
C.connecting
D.contained
您可能感興趣的試卷
- 2009年計(jì)算機(jī)技術(shù)與軟件專業(yè)技術(shù)資格高級(jí)系統(tǒng)架構(gòu)設(shè)計(jì)師下半年上午試卷
- 2009年計(jì)算機(jī)技術(shù)與軟件專業(yè)技術(shù)資格高級(jí)系統(tǒng)架構(gòu)設(shè)計(jì)師下半年下午試卷
- 2010年計(jì)算機(jī)技術(shù)與軟件專業(yè)技術(shù)資格高級(jí)系統(tǒng)架構(gòu)設(shè)計(jì)師下半年上午試卷
- 2011年計(jì)算機(jī)技術(shù)與軟件專業(yè)技術(shù)資格高級(jí)系統(tǒng)架構(gòu)設(shè)計(jì)師下半年上午試卷
- 2012年計(jì)算機(jī)技術(shù)與軟件專業(yè)技術(shù)資格高級(jí)系統(tǒng)架構(gòu)設(shè)計(jì)師下半年上午試卷
- 2013年計(jì)算機(jī)技術(shù)與軟件專業(yè)技術(shù)資格高級(jí)系統(tǒng)架構(gòu)設(shè)計(jì)師下半年上午試卷
- 2014年計(jì)算機(jī)技術(shù)與軟件專業(yè)技術(shù)資格高級(jí)系統(tǒng)架構(gòu)設(shè)計(jì)師下半年上午試卷
你可能感興趣的試題
The(1) is a general description of the architecture of a workflow management system used by the WFMC, in which the main components and the associated interfaces are summarized. The workflow enactment service is the heart of a workflow system which consists of several(2).
空白(2)處應(yīng)選擇()
A.workflow engines
B.processes
C.workflow threads
D.tasks
最新試題
空白(1)處應(yīng)選擇()
空白(2)處應(yīng)選擇()
空白(4)處應(yīng)選擇()
空白(1)處應(yīng)選擇()
空白(2)處應(yīng)選擇()
空白(4)處應(yīng)選擇()
空白(5)處應(yīng)選擇()
()is the process of obtaining the stakeholders’ formal acceptance of the completed project scope.Verifying the scope includes reviewing deliverables and work results to ensure that all were completed satisfactorily.
空白(3)處應(yīng)選擇()
空白(5)處應(yīng)選擇()