單項(xiàng)選擇題

Refer to the exhibit. ROUTE.com is planning to implement a secure OSPF network to support traffic between clients on the 172.16.10.0/24 network and the file server on the 172.16.20./24 network. You have been asked to review the implementation and verification plans. Which statement about the plan is true?()

A. It is complete as written
B. It should include a task that verifies that the interarea routes are using the proper MED
C. The plan should include a task that verifies that load sharing is active on the appropriate links
D. The plan should include  a task that verifies end - to - end connectivity between the clients and the file server


您可能感興趣的試卷

你可能感興趣的試題

1.單項(xiàng)選擇題

Refer to the exhibit. ROUTE.com is planning to implement a new secure OSPF network to support traffic between clients on the 172.16.10.0/24 network and the file server on th e 172.16.20./24 network. You have been asked to review the implementation plan for the OSPF project. Which statement about the plan is true?()

A. It is complete as written.
B. It should include a task that shuts down all unused interfaces.
C. It sho uld include tasks that enable and verify OSPF authentication.
D. It should include a task that establishes a file transfer baseline before and after the configuration is changed.

2.單項(xiàng)選擇題

Refer to the exhi bit. ROUTE.com is planning to implement load balancing for traffic between host on the 172.16.10.0/24 and 172.16.20./24 networks. You have been asked to review the implementation plan for this project. Which statement about the plan is true?()

A. It is complete as written.
B. It should include a task to configure multipath to equal a value of 2 on R1 and R4.
C. It should use a ping instead of a traceroute to validate that load balancing has been activated.
D. It should conta in a task that documents the changes made to the configurations.

3.單項(xiàng)選擇題

Refer to the exhibit. ROUTE.com is planning to implement load balancing for traffic between hosts on the 172.16.10.0/24 and 172.16.20./24 networks. You have been ask ed to review the implementation plan for this project. Which statement about the plan is true?()

 

A. It is complete as written.
B. It should include a task to configure EIGRP multipath equal to 2 on R1 and R4.
C. It should inc lude a task to implement OSPF because it handles unequal cost load balancing most efficiently using variance.
D. It should include a task that establishes a baseline before and after the configuration has been changed.

5.單項(xiàng)選擇題

Refer to the exhibit. EIGRP has been configured on router D. Router C is performing mutual redistribution between EI GRP and OSPF. While verifying that the redistribution is functioning properly, you discover that while router C has all of the EIGRP routes in its routing table, router A does not have any routes from the EIGRP domain. What on router C may be the cause o f the problem?()

A. The no auto - summary command needs to be added under router eigrp 1
B. The subnets keyword was not included in the redistribute command under router ospf 1
C. The metric specified for the redistributed EIGRP routes is too large; m aking the EIGRP routes unreachable by router A
D. The default - information originate command needs to be added under router ospf 1
E. The administrative distance of either OSPF or EIGRP must be changed so that EIGRP has a higher administrative distanc e than OSPF

最新試題

Router R1, a branch router, connects to the Internet using DSL. The engineer plans to use a configuration with a dialer interface. The answers list a feature and interface on which the feature could be configured.Which combinations accurately describe the interface under which a feature will be configured?()

題型:?jiǎn)雾?xiàng)選擇題

Which of the following features work the same in both RIP- 2 and RIPng?()

題型:多項(xiàng)選擇題

Router R1 use s MAC address 1111.1111.1111 for its Fa0/0 interface. An engineer sees the following configuration in the output of a show running - config command. Then, the engineer issues a show ipv6 interface brief command. What global unicast IPv6 address does this c ommand display for interface tunnel 1?()interface loopback 1ip address 192.168.1.1 255.255.255.255interface tunnel 1tunnel source loopback 1tunnel destination 192.168.1.2tunnel mode ipv6ip isatapipv6 address 2000::/64 eui - 64

題型:?jiǎn)雾?xiàng)選擇題

A client host uses IPv4 to communicate with one ser ver and IPv6 to communicate with another.Which of the following IPv6 coexistence features is likely at work on the host?()

題型:?jiǎn)雾?xiàng)選擇題

Router R1 has been conf igured with an ipv6 route 2000::/64 S0/0/0 64 command.Which of the following does the 64 at the end of the command represent?()

題型:?jiǎn)雾?xiàng)選擇題

An engineer is trying to summarize the following networks using the "ip summary- address eigrp"command:10.8.88.0/2510.8.89.48/2910.8.64.96/27Which network and subnet mask below would be the smallest EIGRP summary address to include all three subnets?()

題型:?jiǎn)雾?xiàng)選擇題

Which of the following IPv6 tunneling mechanisms support IPv6 IGP routing protocols?()

題型:多項(xiàng)選擇題

The following output on Router R1 lists details of a BGP route for 190.1.0.0/16. Which of the following is true based on this output?()R1# show ip bgp 19 0.1.0.0/16BGP routing table entry for 190.1.0.0/16, version 121Paths: (1 available, best #1, table Default - IP - Routing - Table)Advertised to update - groups:11 2 3 41.1.1.1 from 2.2.2.2 (3.3.3.3)Origin IGP, metric 0, localpref 100, valid, internal, best

題型:多項(xiàng)選擇題

The answers each list a tunnel method and two consecutive IPv6 address quartets.Which answers identify a tunneling method that relies on an IPv4 address to be embedded into an IPv6 address, within the correct quartets listed?()

題型:多項(xiàng)選擇題

The following line of output was gathered on Enterprise Router Ent1 using the command show ip route. Which of the following answers is most likely to be true, based on thi s output?()B 128.107.0.0 [20/10] via 11.11.11.11, 00:02:18

題型:?jiǎn)雾?xiàng)選擇題